Office Information

Mailing Address:
ASOPE, Inc.
PO Box 4188
Lawrenceburg, IN 47025

Physical Address:
ASOPE, Inc.
139 W Tate Street, Suite 6
Lawrenceburg, IN 47025

Toll-Free: (866) 926-1821
Fax: (812) 926-1804
Email: admin@asope.org

 

American Society of Power Engineers, Inc.

Refrigeration and HVAC Operating Engineer
(For Supervisors and Service Managers)

pdf     
Qualifications
  • Minimum age -Adult
  • Education - High School Diploma, GED or equivalent
  • Experience -Two years as a Refrigeration and HVAC Technician or AS Degree Air Conditioning and Supervise one or more Technicians and hold EPA CFC License
  • Minimum Time in Previous Grade - 2 years
  • Examination -Written (Oral or Practical when necessary)
  • Maximum Prime Mover Horsepower (Unsupervised) -unlimited
  • Maximum Refrigeration or Air Conditioning (Unsupervised) -unlimited
 
Curriculum at the Minimum:
  • Thermodynamics, Heat Transfer Theory
  • Principles of heat and temperature measurement
  • States of Matter
  • Gas Laws - Boyle's Law, Charles' Law, Dalton's Law, General Principles of Perfect Gases
  • Safe Handling, Transportation, and Disposal of Refrigerants, Manufacturer Certification R410A
  • Hydrocarbon Refrigerant Oils
  • Ammonia (Refrigerant)
  • Lithium Bromide (Absorbent)
  • Principles of Pressure and Pressure Measurement
  • Refrigeration Cycle (Compression/Hydrocarbon Refrigerants)
  • Hydrocarbon Refrigerant
  • EPA Universal Certified
  • Refrigeration System Components - Evaporators and Condensers, Heat Exchangers
  • Compressors (Electric Motor or Engine-Driven) Reciprocating, Screw, Scroll, Rotary-Helical, Centrifugal
  • Metering Devices (Direct Expansion/Hydrocarbon Refrigerants) Capillary Tube, Orifice, Expansion Valves (TXV, AXV, TAXV) Hot Gas Bypass Valves, Condenser Pressure Regulating Valves
  • Air Conditioning Systems
    Package Systems (Gas/Electric, Heat Pump, Oil/Electric, Etc.), Window Units, Portal Units (Thru-The-Wall), Rooftop Units (HVAC, Vav), Unitary Systems (Split Systems), Condensing Units, Air Handling or Fan Coil Units, Refrigerant Piping, Line Sizing, Installation
  • Heat Pump Systems
    Air Source, Water Source, Ground Source, Supplemental or Cascade
  • Cooling Towers /Evaporative Coolers
  • Thermal Storage Systems
  • Refrigeration Systems (Commercial)
    Coolers and Freezers (Walk-In, Reach-In, Display), Refrigerated Air Dryers and Ice Machines
  • Psychometrics
  • Temperature and Humidity Control Systems
  • Air Filtration and Duct Cleaning
  • Air Quality Measurement and Control
    CO2, CO, O2, 0, and Contaminant Testing
  • Fans
  • Pumps (Water/Fluids)
  • HVAC Electrical Fundamentals
  • HVAC Electrical Components
    Wiring Insulation and Sizing, Fuses, Breakers, Starters – Low Voltage (480 Volts Or Less), High Voltage (208 Through 4,800 Volts or more), Automated Switchgear, Current Sensing Meters and Motor Control
  • Electromechanical Controls
  • Pneumatic Controls
  • DDC Controls for Building Automation
  • Computer Literacy
    Identify and Work With Existing Applications (Excel, Word, Powerpoint, Access, Outlook)
  • Electric Transformers
  • DC Power Supplies and Converters
  • UPS Systems
  • Variable Frequency Drives
  • Electric Motors (AC and DC)
  • Engine Driven Suppressers and Pumps
  • Troubleshooting ACR Electrical Systems
    Personal Protective Equipment, Lockout/Tagout Practices, Meter Categories, Test Procedures, Electrical Diagrams, Schematic (Ladder) Diagrams, Pictorial Diagrams, Installation Diagrams, Fundamentals Of Electrical Trouble Shooting, Trouble Shooting Electrical Components.
  • ACR System
    Service System Base Lining, Service Equipment and Practices, System Start-Up, Operational Checks. Preventive Maintenance and Mechanical Troubleshooting.